【24h】

Replacement of the Triborough Bridge Randall's Island Junction Structure

机译:特里伯勒大桥兰德尔岛交界处结构的更换

获取原文
获取原文并翻译 | 示例

摘要

Parsons Transportation Group/Steinman began design of the structure replacement in 1995, and is now providing support services during construction, which began in 1998. Replacement of the Randall's Island Junction continues to provide challenges during the construction phase due to the complex geometry of the structure, the close spacing of the existing substructure elements and the need to continuously maintain traffic during construction. With continued cooperation and dedication of all parties involved, the construction project will be successfully completed in the Spring of 2003.
机译:帕森斯运输集团/斯坦曼于1995年开始设计结构更换,现在从1998年开始在施工期间提供支持服务。由于结构的复杂几何形状,在施工阶段更换Randall's Island Junction仍然带来挑战,现有子结构元素的紧密间距以及在施工过程中持续保持交通流量的需求。在有关各方的不断合作和奉献下,该建设项目将于2003年春季成功完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号