首页> 外文会议>2002 ASME International Mechanical Engineering Congress and Exposition , Nov 17-22, 2002, New Orleans, Louisiana >METHODOLOGY FOR ENGINEERING COST AND LEAD-TIME ESTIMATION IN METAL CASTING APPLICATIONS
【24h】

METHODOLOGY FOR ENGINEERING COST AND LEAD-TIME ESTIMATION IN METAL CASTING APPLICATIONS

机译:金属铸造应用中的工程成本和提前期估算方法

获取原文
获取原文并翻译 | 示例

摘要

Accurate cost and lead-time estimation are very important issues during product design stage as well as for procurement process. The initial cost estimate can have profound effect on the project success or its failure. Inaccurate initial cost estimation can lead to financial losses that can have severe consequences on the project and company. Hence it is important to have accurate and easily accessible method for accurate cost and lead-time estimation. There are several estimation methods with focus on different manufacturing processes. These methods are based on general process description, and their process models and associated empirical data have limited accuracy. Also, most of them are not readily accessible to the engineers or procurement personnel. This paper presents application of one the more accurate estimation methods developed by the Air Force for metalcasting cost estimation. The method has been deployed on the Internet and can be easily accessed.
机译:在产品设计阶段以及采购过程中,准确的成本和提前期估算都是非常重要的问题。初始成本估算可能会对项目的成败产生深远影响。不正确的初始成本估算可能会导致财务损失,从而可能对项目和公司造成严重后果。因此,重要的是要有一种准确且易于访问的方法来进行准确的成本和交货期估算。有几种估算方法着重于不同的制造工艺。这些方法基于一般的过程描述,并且它们的过程模型和相关的经验数据的准确性有限。而且,工程师或采购人员不容易接触到它们中的大多数。本文介绍了由空军开发的一种更准确的估算方法,用于金属铸造成本估算。该方法已部署在Internet上,可以轻松访问。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号