首页> 外文会议>2008 NPRA annual meeting technical papers >Tesoro Upgrade Project – Salt Lake City FCC Regenerator Mechanical Upgrades to Improve Coke Burning Efficiency and Improve Emissions
【24h】

Tesoro Upgrade Project – Salt Lake City FCC Regenerator Mechanical Upgrades to Improve Coke Burning Efficiency and Improve Emissions

机译:Tesoro升级项目–盐湖城FCC蓄冷器机械升级,以提高焦炭燃烧效率并减少排放

获取原文
获取原文并翻译 | 示例

摘要

During Spring 2007 cat cracker turnaround, Tesoro Refining & Marketing Company (Tesoro)rnimplemented RMS Engineering Inc. (RMS) propriety technologies to improve the performance ofrnits Salt Lake City (SLC) FCCU regenerator. RMS was responsible for providing the totalrnengineering design that included front end engineering design (FEED), as well as detailrnengineering activities. It should be noted that Tesoro employed Shaw Stone & Webster, Inc.rntechnologies and engineering services for modifications to the FCCU "reactor" system.rnThis presentation highlights RMS' FCC regenerator technologies, compares the cat crackerrnperformance pre- and post- turnaround, and demonstrates how the Tesoro SLC refinery benefitedrnfrom installing these retrofits in its FCCU regenerator.rnMany individuals in the Tesoro organization were responsible for this success story. In particularrnRMS is grateful to Matt Baebler, Ray Lahti, John Postacchini, and Herb Telidetzki.
机译:在2007年春季的猫饼干转机期间,Tesoro精炼和营销公司(Tesoro)实现了RMS Engineering Inc.(RMS)专有技术,以提高盐湖城(SLC)FCCU再生器的性能。 RMS负责提供总体工程设计,其中包括前端工程设计(FEED)以及详细工程活动。应该指出的是,Tesoro聘用了Shaw Stone&Webster,Inc.的技术和工程服务来对FCCU“反应器”系统进行修改。rn本演讲重点介绍了RMS的FCC再生器技术,比较了Cat饼干的转弯前后性能,并演示了Tesoro SLC炼油厂如何在FCCU再生器中安装这些改造项目而受益匪浅。Tesoro组织中的许多人都为这一成功案例负责。 RMS特别感谢Matt Baebler,Ray Lahti,John Postacchini和Herb Telidetzki。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号