Case history - Contract employee cuts into energized 13.8 kV cable

机译:案例历史记录-合同工切入带电的13.8 kV电缆

获取原文
获取原文并翻译 | 示例

摘要

While performing routine construction work on a new indoor substation which was replacing an existing substation, a contact employee cut into shielded medium voltage cable that was energized at 13,800 volts phase-to-phase. This paper describes how management systems failed and allowed this to happen, and describes lessons learned from the incident.
机译:在对新的室内变电站进行例行施工的过程中,该变电站要替换现有的变电站,一位联络员工将屏蔽的中压电缆切成相间电压为13,800伏。本文描述了管理系统如何失败并允许这种情况发生,并描述了从事件中吸取的教训。