In this paper, a study has been made on the cost and performance analysis of wind power plant in the coastal region of Chittagong of Bangladesh using RET Screen software. Till to date, no reliable data on wind power is available on Bangladesh. Very recently, some organizations named BPDB, Bangladesh Metrological Department and CWET of India have taken up projects to study wind potential along the costal belt of Bangladesh. Among them BPDB has taken up several programs named WERM, SWERA and WRAP in the country [1]. As reliable data of wind is not available, proper design on wind power plant is not feasible. As a result, harnessing energy from wind remains a remote possibility. The power development board, Bangladesh (BPDB) installed 50 numbers of turbines in the costal belt of Kutubdia in the year March 2008 [2]. Unfortunately vary little amount of energy could be extracted so far and most of pillars and turbines are rushed and has become inoperative. The main reason for such set back is due to lack of proper feasibility study and reliable data on wind. Taking all those points in serious consideration, author in this paper have tried to collect a reliable data on wind along the costal belt of Chittagong and based on this data, possible power generation from wind is analysed through RET Screen. With this user friendly software, optimum number of units together with cost of energy (COE).
机译:本文使用RET Screen软件对孟加拉国吉大港沿海地区的风力发电厂的成本和性能进行了研究。迄今为止,孟加拉国尚无可靠的风力发电数据。最近,一些名为BPDB,孟加拉国孟加拉国计量局和印度CWET的组织已开始研究有关孟加拉国沿海地带风能的项目。其中BPDB在该国采用了几个名为WERM,SWERA和WRAP的程序[1]。由于没有可靠的风能数据,因此在风电厂进行适当的设计是不可行的。结果,利用风能的可能性仍然很小。孟加拉国电力发展委员会(BPDB)于2008年3月在库图布迪亚沿海地区安装了50台涡轮机[2]。不幸的是,到目前为止,只能提取很少量的能量,大多数支柱和涡轮机都奔涌而去,无法使用。造成这种挫折的主要原因是由于缺乏适当的可行性研究和可靠的风能数据。考虑到所有这些问题,本文的作者试图收集吉大港沿岸风的可靠数据,并基于此数据,通过RET Screen分析了风的可能发电。使用此用户友好的软件,可以优化设备数量,并节省能源成本(COE)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号