Utilization of idle power plant for own use and excess power in an oil-and-gas company

机译:闲置发电厂的自用和油气公司的多余电力

获取原文
获取原文并翻译 | 示例

摘要

The Indonesian government (GoI) applies the cost recovery concept in the upstream sector of the oil and gas resources. It postulates the expenses spent by the contractor during exploration and exploitation activities will be settled through production sharing scheme. The cost includes the compensation for the production equipment and utilities, not to mention the power generator. When the oil-and-gas exploitation declines or even shut-in due to technical and economic reasons, some of them become idle assets. In this study, we investigate the utilization of the idle 2 × 750 kVA gas engine power generators for a new gas facilities project in different region. As the newly facilities require a smaller power supply (2 × 350 kVA) than the power plant capacity, the excess power is proposed to be sold to the electric utility. Here, an economic analysis is carried out to compare between purchasing new power generators and the utilization of the idle ones. The result shows that the utilization of idle asset provides economic benefit both for the GoI and the contractor. This scheme will solve the electricity need for own use and the excess power may be transferred to the electric utility, realized by power purchase agreement.
机译:印尼政府(GoI)在石油和天然气资源的上游部门应用成本回收概念。它假定承包商在勘探和开采活动中花费的费用将通过生产共享计划来支付。成本包括生产设备和公用事业的补偿,更不用说发电机了。当由于技术和经济原因导致油气开采量下降甚至停产时,其中一些变成闲置资产。在这项研究中,我们调查了闲置的2×750 kVA燃气发动机发电机在不同地区的新天然气设施项目中的利用率。由于新的设施需要比发电厂容量小的电源(2×350 kVA),因此建议将多余的电力出售给电力公司。在这里,进行了经济分析,以比较购买新发电机和闲置发电机的利用率。结果表明,闲置资产的利用为政府和承包商都带来了经济利益。该方案将解决自用电力需求,多余的电力可以通过购电协议实现转移到电力公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号