U-shaped line balancing model with an uncertain time on all tasks

机译:时间不确定的U型线平衡模型

获取原文
获取原文并翻译 | 示例

摘要

U-shaped Assembly Line (UAL) utilizes many manufacturing industries. It applies the just-in-time principle and the quality practice. It decreases the waste in the manufacturing operation. This paper presents the UAL model which consists of eleven uncertain tasks. The uncertain tasks assume the time distribution that is discrete. The uncertain task time classifies to three types such as the optimistic time, the normal time, and the pessimistic time. The objective function of the model is the minimum number of workstations. The model formulates on a 0-1 integer linear programming. This academic work applies MATLAB R2014a which solves the solution of the model. The procedure is run by INTLINPROG toolbox. The solution of the uncertain task is the optimistic time that is the earliest finish duration. The earliest finish tasks which assign along the UAL line affect the minimum workstations.
机译:U形装配线(UAL)利用了许多制造业。它应用即时原则和质量实践。它减少了制造过程中的浪费。本文提出了由11个不确定任务组成的UAL模型。不确定的任务假定时间分布是离散的。不确定的任务时间分为乐观时间,正常时间和悲观时间三种。该模型的目标功能是最少的工作站数量。该模型基于0-1整数线性规划公式。这项学术工作应用了MATLAB R2014a解决了模型的求解。该过程由INTLINPROG工具箱运行。不确定任务的解决方案是最早完成时间的乐观时间。沿UAL线分配的最早完成任务会影响最小工作站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号