首页> 外文会议>2017 XLIII Latin American Computer Conference >BIM practices to operation and maintenances for electrical substations
【24h】

BIM practices to operation and maintenances for electrical substations

机译:BIM操作和维护变电站的实践

获取原文
获取原文并翻译 | 示例

摘要

The emerging of BIM (Building Information Modeling) techniques will change traditional procedures of design and maintenance for electric substations. In addition, Computational Holography, supported by wearable computers, has the potential to allow simultaneous engineering work, based on mixed reality and computer vision capabilities. It is believed that this set of tools will increase engineering design decisions. In this work, we propose a set of techniques to support a complete substation design, which is created by using BIM concepts that explore the Holographic world benefices. Experiments have shown that the coupling of these techniques has the potential to reduce the learning curve of the users, since it changes the way of collaboration among different professional specialists considering simulation intents.
机译:BIM(建筑信息建模)技术的出现将改变变电站的传统设计和维护程序。此外,在可穿戴计算机的支持下,基于混合现实和计算机视觉功能的计算全息技术有可能允许同时进行工程工作。据信,这套工具将增加工程设计决策。在这项工作中,我们提出了一套技术来支持完整的变电站设计,这是通过使用探索全息世界的受益者的BIM概念创建的。实验表明,这些技术的结合可以减少用户的学习曲线,因为它改变了考虑模拟意图的不同专业专家之间的协作方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号