With an estimated 1000 new waste treatment facilities needing to be built before 2010 so that the UK can meet its obligations under the EU Landfill Directive (99/31/EC) local authorities are feeling increasing pressure to deliver waste infrastructure in a timely and cost effective fashion. Historically, the development of new (or even the extension of existing) waste treatment facilities has been a contentious subject with local residents, and other stakeholder groups. With the added pressure of limited time and mounting costs local authorities cannot afford to go through lengthy planning appeals and must get the public engaged and involved as soon as possible. There is little doubt that early and comprehensive public consultation and engagement will be essential to future successful waste planning processes.rnIn the production of a revolutionary new toolkit, many of the key questions concerning why, when, who and how to consult, are answered to provide a full and factual guidance document on consulting key stakeholders in the planning of new waste management facilities. The guidance was produced as a result of a partnership between the Welsh Local Government Association (WLGA), Welsh Assembly Government (WAG), Environment Agency Wales (EAW) and Waste Awareness Wales (WAW). These organisations realised the need for this kind of support as the simplest of new facilities (including recycling banks) were being blocked at the planning stage in Wales. Although the toolkit has been produced for Wales its contents can (and should) easily be applied to the rest of the UK and possibly beyond.rnThe toolkit considers the different stages of consultation, from awareness raising and strategic evaluation, through to understanding of the need for change, to choice of technology, decisions on site planning criteria, and ultimately planning and licensing applications for specific facilities. The toolkit provides indicative timings and costs for running campaigns, along with detailed facts and images / video footage of all types of waste treatment technologies to help explain these issues to the widest of stakeholder groups.rnThis paper will draw on the findings of the toolkit, and headline our experiences of best practice from across the UK. We will consider the why, when, who and how's of consultation. We will also identify potential problems that can be addressed in the planning of a consultation campaign, in the hope of offering the waste management industry some guidance not only on how to get facilities accepted and built in time for our impending deadlines but on how to build relationships with a more enlightened public.
机译:据估计,2010年之前需要建造1000个新的废物处理设施,以使英国能够履行欧盟垃圾填埋指令(99/31 / EC)的义务,地方当局感到越来越大的压力,要求及时,经济地交付废物基础设施时尚。从历史上看,新的(或什至是现有的)废物处理设施的开发一直是当地居民和其他利益相关者团体的争论主题。有限的时间和不断增加的成本增加了压力,地方当局无力进行冗长的规划呼吁,必须尽快让公众参与。毫无疑问,早期和全面的公众咨询与参与对于未来成功的废物规划流程必不可少。rn在制作革命性的新工具包时,许多关键问题涉及为何,何时,谁以及如何进行咨询,提供一份完整的事实指导文件,以咨询新的废物管理设施规划中的主要利益相关者。该指南是威尔士地方政府协会(WLGA),威尔士议会政府(WAG),威尔士环境局(EAW)和威尔士废物意识(WAW)之间合作的结果。这些组织意识到,在威尔士的规划阶段就已经封锁了最简单的新设施(包括回收银行),因此需要这种支持。尽管该工具包是为威尔士生产的,但其内容可以(并且应该)轻松地应用于英国其他地区以及可能的其他地区。rn该工具包考虑了咨询的不同阶段,从提高意识和战略评估到对需求的理解变更,技术选择,现场规划标准的决策,以及最终针对特定设施的规划和许可申请。该工具包提供了指示性的运行时间和费用,并提供了各种废物处理技术的详细事实和图像/录像,以帮助最广泛的利益相关者团体解释这些问题。rn本文将借鉴该工具包的发现,并将我们在英国各地的最佳实践经验作为标题。我们将考虑为什么,何时,何人以及如何进行咨询。我们还将确定可以在咨询活动的计划中解决的潜在问题,希望为废物管理行业提供一些指导,不仅包括如何在即将到来的截止日期之前及时接受和建造设施,还包括如何建造与更开明的公众的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号