Revamping of No.2 Sinter Plant at Pohang Works

机译:浦项工厂第二烧结厂改造

获取原文
获取原文并翻译 | 示例

摘要

The revamping of POSCO Pohang No.2 sinter plant was carried out in 1997, from Apr. 21st to Jul. 31st during same period of No.2 blast furnace 2nd relining. Our targets of this project are to make stable supplying of sintered ore to No.2 B.F, prevention of air pollution and managing the proper man power odifications are consisted of five section largely, i) Improvement of operation flow, ii) Improvement of facility function, iii) Improvement of E.P, iv) Changed and enlarged old fa ilities, v) Establishment of new facilities. With these modification we can gain the costal competition and improved facilities, and also prepare for the "Environmental Regulation".
机译:浦项制铁浦项第二烧结厂于1997年4月21日至7月31日进行了改建,同时进行了第二高炉第二次衬砌。该项目的目标是稳定地向2号高炉供应烧结矿,防止空气污染和管理适当的人力调整主要包括五个部分:i)改善操作流程,ii)改善设施功能,iii)改善环保,iv)改变和扩大旧设施,v)建立新设施。通过这些修改,我们可以获得激烈的竞争和改进的设施,还可以为“环境法规”做准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号