CONTROL SYSTEM TRIPS DURING FACTORY SITE ACCEPTANCE TESTS IN THE CHEMICAL INDUSTRY

机译:化工行业现场验收测试期间的控制系统旅行

获取原文
获取原文并翻译 | 示例

摘要

A study was done by Fick (2008) to investigate the risk that control system trips may cause during a project's life cycle in the chemical industry in South Africa. During this study a model was developed to minimise the risk caused by control system trips in the different phases of a project. This model was validated by means of various questionnaires and applied to an actual project.rnDuring the development and validation of a detailed CSTMP (Control System Trip Management Plan) a major shortcoming was identified. This shortcoming consisted of lack of knowledge about the FAT and the importance of the FAT (Factory Acceptance Test) during the execution phase of a project, especially from an Engineering Manager's view point.rnThis article will give guidance and help to engineers and engineering managers on the pre-work, execution and follow-up of a FAT for control system trips in the chemical industry. This can also be applicable to all other industries.
机译:Fick(2008)进行了一项研究,以调查在南非化学工业项目生命周期中控制系统跳闸可能引起的风险。在这项研究期间,开发了一个模型,以最大程度地减少在项目的不同阶段由控制系统跳闸引起的风险。该模型已通过各种调查问卷进行了验证,并应用于实际项目。在开发和验证详细的CSTMP(控制系统行程管理计划)期间,发现了一个主要缺陷。这种缺点包括缺乏对FAT的了解以及在项目执行阶段对FAT(工厂验收测试)的重要性的理解,尤其是从工程经理的角度。rn本文将为工程师和工程经理提供指导和帮助FAT在化学工业中用于控制系统故障的FAT的工作前,执行和后续工作。这也可以适用于所有其他行业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号