【24h】

EVALUATION OF CASING-CEMENT-MANTLE COUPLING FAILURE FOR THECNG STORAGE WELL

机译:储气井套管-水泥-地幔耦合破坏评价

获取原文
获取原文并翻译 | 示例

摘要

In recent years, the gas storage well bolted out frequently everywhere. Those accidents usuallyrnresult in the failure of the pipe's junctions on the shaft collar. Sometimes even the whole tubrnbroke out from the ground. As a result, the natural gas leaks, gas storage well is abandoned, evenrncauses big fire, explosion. Considered casing, cement mantle and layer as elastic material,rnelasticity theory and thick-cylinder theory were adopted; casing-cement-mantle layer model wasrnbuilt in the paper. Basic dynamic parameters of layer, geometric and physical parameters ofrncement mantle, and geometric parameters of casing were analyzed. The major failure causes andrnmeasurements to control gas well accidents were suggested in the paper.
机译:近年来,储气井到处频繁爆破。这些事故通常导致轴环上的管道连接处失效。有时,甚至整个tubrnbroke从地面。结果,天然气泄漏,储气井被废弃,甚至引起大火,爆炸。以套管,水泥地幔和地层为弹性材料,采用弹性理论和厚圆筒理论。本文建立了套管-水泥-幔幔模型。分析了层的基本动力学参数,地幔的几何和物理参数以及套管的几何参数。提出了控制气井事故的主要失效原因及对策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号