首页> 外文会议>Agile processes in software engineering and extreme programming >Evidence-Based Timelines for Agile Project Retrospectives - A Method Proposal
【24h】

Evidence-Based Timelines for Agile Project Retrospectives - A Method Proposal

机译:敏捷项目回顾的基于证据的时间表-方法建议

获取原文
获取原文并翻译 | 示例

摘要

Retrospective analysis of agile projects can support identification of issues through team reflection and may enable learning and process improvements. Basing retrospectives primarily on experiences poses a risk of memory bias as people may remember events differently, which can lead to incorrect conclusions. This bias is enhanced in project retrospectives which cover a longer period compared to iteration retrospectives. To support teams in recalling accurate and joint views of projects, we propose using an evidence-based timeline with historical data as input to project retrospectives. The proposed method was developed together with a large software development company in the telecommunications domain. This paper outlines a method for visualizing an evidence-based project timeline by illustrating aspects such as business priority, iterations and test activities. Our method complements an experience-based approach by providing objective data as a starting point for reflection and aims to support objective analysis of issues and root causes.
机译:敏捷项目的回顾性分析可以通过团队反思来支持问题的识别,并且可以促进学习和流程的改进。主要基于经验进行回顾,存在记忆偏差的风险,因为人们可能会以不同的方式记住事件,这可能导致错误的结论。在项目回顾中,与迭代回顾相比,其涵盖了更长的时间,这种偏见得到了增强。为了支持团队回顾项目的准确和共同的观点,我们建议使用基于证据的时间表,结合历史数据作为项目回顾的输入。提议的方法是与电信领域的一家大型软件开发公司共同开发的。本文通过说明业务优先级,迭代和测试活动等方面,概述了一种可视化基于证据的项目时间表的方法。我们的方法通过提供客观数据作为反思的起点来补充基于经验的方法,旨在支持对问题和根本原因的客观分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号