【24h】

How to Apply Process Safety Management to Capital Projects

机译:如何将流程安全管理应用于基本建设项目

获取原文
获取原文并翻译 | 示例

摘要

As a project progresses from beginning to end, how is good Environmental, Health and Safety (EHS) control maintained? When are EHS gate reviews needed during the progress of a capital project? How does one verify and confirm all related requirements have been met before starting the next phase of the project? As a practice example, the "7 Phases and 6 Gates" system integrates project requirements, local laws /governmental requirements, and the 14 elements of the OSHA PSM standard into the overall progress measurement of the capital project, while at the same time, uses an electronic-database to carry out all approval flows, action item tracking and houses all documentation.
机译:随着项目从头到尾的进行,如何保持良好的环境,健康与安全(EHS)控制?在基本建设过程中,什么时候需要EHS门审查?在开始下一阶段的项目之前,如何验证并确认所有相关要求已得到满足?作为一个实践示例,“ 7个阶段和6个门”系统将项目要求,当地法律/政府要求以及OSHA PSM标准的14个元素集成到基本项目的总体进度度量中,同时使用一个电子数据库,用于执行所有批准流程,跟踪操作项并存放所有文档。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号