In 2001, Metcalf & Eddy and the Sandwich Water District conducted a successful lining trial using rapid-setting polymeric lining material to determine if the material could prevent PCE from entering the water supply from factory produced vinyl lined asbestos cement (AC) water mains. The detailed results of this trial were published in the June 2003, Journal of the New England Water Works Association. This paper will expand on the lining trial to include the planning, design, and construction of the 8,500 linear foot vinyl lined AC water main relining project recently completed for the Sandwich Water District. The project is one of the first projects in the United States to use the spray applied rapid-setting polymeric lining material. The Sandwich lining project included development of a "same day return to service" procedure for newly lined water mains, which would allow up to 1,400 linear feet of water mains to be taken out of service, relined, and put back in service all within a 12 hour period. The same day return to service project would eliminate the need for overland bypass piping, which would ultimately result in a reduction to the overall project cost. To allow for the elimination of bypass piping, a successful public notification program and a stringent quality assurance program were developed to ensure a successful lining job. Although bypass piping was ultimately provided by the contractor, the programs developed for the same day return to service procedure contributed to a very successful lining project that proved to be a valuable test for these programs.
机译:在2001年,Metcalf&Eddy和Sandwich Water District使用快速固化的聚合物衬里材料进行了成功的衬里试验,以确定该材料是否能够阻止PCE从工厂生产的乙烯衬石棉水泥(AC)水总管进入供水系统。该试验的详细结果发表在2003年6月的《新英格兰水厂协会杂志》上。本文将在衬砌试验的基础上进行扩展,包括规划,设计和建设最近为Sandwich Water District完成的8,500线性英尺乙烯衬里AC供水总衬砌项目。该项目是美国首批使用喷涂的速凝聚合物衬里材料的项目之一。三明治衬砌项目包括为新衬砌的水管开发“当日恢复服务”程序,该流程将允许最多1,400线性英尺的水管停用,重新衬砌并重新投入使用。 12小时内。当天恢复服务项目将消除对陆上旁路管道的需求,最终将导致总体项目成本的降低。为了消除旁路管道,制定了成功的公共通告程序和严格的质量保证程序,以确保衬砌工作成功。尽管承包商最终提供了旁路管道,但为当天恢复服务程序而开发的程序却为非常成功的衬砌项目做出了贡献,事实证明这对这些程序而言是一项宝贵的测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号