首页> 外文会议>Asia Pacific conference on integrated modelling for asset management >worldwide Fiscal Systems: How are Abandonment Costs Treated
【24h】

worldwide Fiscal Systems: How are Abandonment Costs Treated

机译:全球财政系统:如何处理遗弃费用

获取原文
获取原文并翻译 | 示例

摘要

The costs of the abandonment of a field development depend on the geographical location of the structures and the number of platforms for each field, the water depth, topside weight, jacket weight, type of structure, proximity to shore, availability of equipment and the level of removal required. Thus, the overall cost of removing existing platforms is difficult to predict but is estimated to be tetween US
机译:放弃油田开发的成本取决于建筑物的地理位置和每个油田的平台数量,水深,上层重量,外套重量,结构类型,与海岸的距离,设备的可用性和水平需要移除。因此,移除现有平台的总体成本难以预测,但估计介于美国之间

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号