【24h】

CONTROLLED BLASTING OF COMMERCIAL COMPLEX

机译:商业综合体的控制爆破

获取原文
获取原文并翻译 | 示例

摘要

A newly built commercial complex in Sichuan, China was found to have substantially encroached upon state land. A survey was undertaken and the affected portion of the building had to be removed in order to comply with the authorities' regulation. In view of time constraint, demolition technique using explosives were selected instead of the conventional bull dozing method. Also, a structural strengthening technique employing fiber-reinforced plastic (frp) to protect the structural members to be retained was preferred over conventional strengthening techniques based on time, cost and structural performance considerations. This paper presents how the project was undertaken and completed within only 15 days.
机译:人们发现,中国四川省的一个新建的商业综合体已经严重侵占了国有土地。进行了调查,必须拆除建筑物的受影响部分,以符合当局的规定。鉴于时间限制,选择了使用炸药的拆除技术来代替传统的推土机方法。同样,基于时间,成本和结构性能的考虑,与传统的加固技术相比,采用纤维加固的塑料(frp)保护要保留的结构构件的结构加固技术更为可取。本文介绍了该项目如何在15天内完成和完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号