【24h】

The Role of a Board of Consultants in Site-Specific PMP and PMF Studies

机译:顾问委员会在特定地点的PMP和PMF研究中的作用

获取原文
获取原文并翻译 | 示例

摘要

Site-specific PMP and PMF studies by their very nature do not lend themselves to one standard procedure. By virtue of a unique geographical setting, a site-specific PMP/PMF study considers new approaches or will modify existing ones to meet the needs of the area. To date, there are relatively few successfully completed site-specific PMP studies in the U.S. for dam owners and others to draw on. For this reason, retaining a Board of Consultants (BOC) to oversee these site-specific PMP/PMF studies can provide valuable benefits by providing a multi-disciplinary team to address the problem. This paper examines the role of a BOC throughout development of a site-specific PMP, and subsequently, a revised PMF on the Upper and Middle Dams drainage basin in western Maine. Interactions between all stakeholders; the owner, regulator, consultants and the BOC, are presented to highlight the process. Results of the BOC effort are presented, along with the overall impact on the final PMP/PMF for the two dams. A PMP/PMF study is of considerable importance in assessing dam safety. Results of this study may indicate that costly dam modifications are required to safely pass the required spillway design flood. Therefore, it may be in a dam owner's best interest to consider a site-specific PMP/PMF study that more appropriately estimates the PMP and PMF for the area in question, rather than relying on the "standard" approach as presented in Hydrometeorological Report No. 51 (HMR 51) and other documents. A site-specific PMP/PMF study challenges the "normal" published approach to development of a PMP/PMF for a dam. Therefore, approval by the regulating agencies requires additional considerations not encountered with the "standard" approach. This paper shows that a Board of Consultants can play an important role in producing a successful study. The independent guidance and oversight from the BOC brings an additional level of credibility to the study and improves the likelihood of approval by regulatory agencies.
机译:特定于站点的PMP和PMF研究本身并不适合一种标准程序。凭借独特的地理环境,针对特定地点的PMP / PMF研究将考虑新方法或将修改现有方法以满足该地区的需求。迄今为止,在美国,只有少数几位成功完成针对大坝所有者和其他人的针对特定地点的PMP研究。因此,聘请顾问委员会(BOC)来监督这些针对特定地点的PMP / PMF研究可以通过提供一个多学科团队来解决该问题而提供宝贵的收益。本文研究了中银在整个特定地点的PMP以及整个缅因州西部大坝和中坝流域的PMF修订过程中的作用。所有利益相关者之间的互动;所有者,监管者,顾问和中国银行将重点介绍该过程。介绍了中国银行努力的结果,以及对两个大坝最终PMP / PMF的总体影响。 PMP / PMF研究对评估大坝安全性非常重要。这项研究的结果可能表明,为了安全地通过所需的溢洪道设计洪水,需要进行昂贵的大坝改造。因此,考虑特定地点的PMP / PMF研究可能更适合大坝所有者的利益,该研究可以更适当地估算相关区域的PMP和PMF,而不是依赖于《水文气象报告No》中介绍的“标准”方法。 51(HMR 51)和其他文件。针对特定地点的PMP / PMF研究挑战了为大坝开发PMP / PMF的“正常”发布方法。因此,要获得监管机构的批准,还需要“标准”方法未遇到的其他考虑。本文表明,顾问委员会可以在完成一项成功的研究中发挥重要作用。中行的独立指导和监督为研究带来了更高的可信度,并提高了监管机构批准的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号