【24h】

TIMBER-FACED RCC DAM AN HISTORIC LOOK WITH STATE-OF-THE-ART TECHNOLOGY

机译:面对面的RCC大坝,具有最先进的技术

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the challenges faced and approaches used to economically replace a deteriorated historic timber crib dam using modern materials and techniques. Key issues discussed include the selection of the RCC mix and mixing plant, quality control during construction, RCC delivery and placement equipment, and the facing treatment. Lessons learned from this project are presented, including details and construction methods that worked well, along with a discussion of problems that should be avoided.
机译:本文介绍了面临的挑战以及使用现代材料和技术从经济上替代退化的历史悠久的婴儿床的方法。讨论的关键问题包括RCC混合和搅拌设备的选择,施工期间的质量控制,RCC输送和放置设备以及饰面处理。介绍了从该项目中学到的教训,包括有效的详细信息和构造方法,以及对应避免的问题的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号