Alternative Project Delivery for Combined Sewer Separation in Downtown Nashville

机译:纳什维尔市区下水道分离的替代项目交付

获取原文
获取原文并翻译 | 示例

摘要

In 1990, the Nashville Metropolitan Department of Water Services began work on its $800rnmillion Overflow Abatement Program to mitigate combined and separate sanitary sewerrnoverflows from its wastewater collection system. Since then, with the cooperation of therncommunity and through an agreement with the Tennessee Department of Environment andrnConservation, the program has completed system improvements costing more than $500 million.rnThe completion of the $26 million Demonbreun Combined Sewer Separation Project played arnsignificant role in the success of the program – eliminating eight overflows from thernDemonbreun drainage basin.rnNashville recently invested in two major downtown capital projects: a $125 million arena and arn$292 million stadium. The arena and the stadium projects imposed time and schedulingrnconstraints on the design and construction of the Demonbreun Combined Sewer SeparationrnProject. To accomplish the construction under these constraints, Nashville used fast track designrnand construction methods to complete the separation project in two phases. The project teamrncompleted the design and construction of Phase 1 over the 11-month period prior to the openingrnof the arena. Phase 2 was completed over the 20-month period prior to the scheduled start ofrnroadway and bridge improvements for access to the new stadium.rnParticular emphasis was placed on obtaining special budgeting and purchasing systems with therncooperation of the Metro Purchasing Department and the Metropolitan Development andrnHousing Authority. The design consultant accelerated the schedule by designing each phase ofrnthe project in segments. As the consultant completed the design of each segment, and walked itrnthrough the approval process, the segment was released to the contractor for construction.rnStrategic planning enabled the project team to coordinate the work with all parties involved in orrnaffected by the project – agencies, utilities, contractors, subcontractors, property owners, andrnother stakeholders.
机译:1990年,纳什维尔市水务局开始进行其耗资8亿美元的溢流消除计划,以减轻污水收集系统中合并和分开的卫生污水的溢流。此后,在社区的合作下,并通过与田纳西州环境与自然保护部的协议,该计划完成了耗资超过5亿美元的系统改进。耗资2600万美元的Demonbreun污水下水道分离项目的成功完成对该计划–消除了来自rnDemonbreun流域的八处溢水。纳什维尔最近投资了两个主要的市区基本建设项目:一座耗资1.25亿美元的体育馆和2.92亿美元的体育场。竞技场和体育场项目对Demonbreun联合下水道分离项目的设计和施工施加了时间和进度上的限制。为了在这些限制条件下完成施工,纳什维尔使用快速通道设计和施工方法分两个阶段完成了分离项目。项目团队在竞技场开放前的11个月内完成了第一阶段的设计和建设。第二阶段是在计划的道路和桥梁改善以进入新体育场之前的20个月内完成的。特别强调的是与地铁采购部和大都会发展和房屋管理局的合作获得特殊的预算和采购系统。 。设计顾问通过分段设计项目的每个阶段来加快进度。当顾问完成每个部分的设计并完成审批流程后,该部分将发布给承包商进行施工。战略规划使项目团队能够与受项目影响的所有各方(代理,公用事业)协调工作,承包商,分包商,业主和其他利益相关者。

著录项

  • 来源
  • 会议地点 Cleveland OH(US);Cleveland OH(US);Cleveland OH(US)
  • 作者

    Mike Burgett; Joe Whitson;

  • 作者单位

    Gresham, Smith and Partners, 511 Union Street, Nashville, TN 37219 PH 615-770-8531 mike_burgett@gspnet.com;

    Partner, Gresham, Smith and Partners, 511 Union Street, Nashville, TN 37219 PH615-770-8427joe_whitson@gspnet.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道设备;管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号