首页> 外文会议>Biennial International Pipeline Conference(IPC 2004) vol.3; 20041004-08; Calgary(CA) >REABILITY CENTERED MAINTENANCE (RCM), GAIN AND RESULTS 3 YEARS AFTER IMPLEMENTATION
【24h】

REABILITY CENTERED MAINTENANCE (RCM), GAIN AND RESULTS 3 YEARS AFTER IMPLEMENTATION

机译:实施后3年的可靠性中心维护(RCM),收益和结果

获取原文
获取原文并翻译 | 示例

摘要

TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A. - Started in 2000, a program of studies based on the methodology of Reliability Centered Maintenance (RCM) with a goal of analyzing its main and more critical facilities and systems according to this methodology seeking to guarantee a high reliability by means of the maintenance. This studies presented quite expressive results: it allowed to the participants to know in depth the systems and devices of the facilities; identify through a FMEA (Failure Modes and Effects Analysis) all the main manners of failures of the functions of the several systems and devices; to evaluate the consequences of the failures and its impact under safety's point of view, environment and operation of the station; to determine the maintenance activities (preventive, predictive and of search of failures) necessary to the maintenance of the reliability of the station; to identify opportunities of improvements in the project of the installation seeking the increment of its reliability; to identify needs of implementation of operation procedures and maintenance or modification in the existent ones.
机译:TBG-巴西运​​输公司巴西-巴西通过维护获得可靠性。这项研究提出了颇具表现力的结果:它使参与者能够深入了解设施的系统和设备;通过FMEA(故障模式和影响分析)识别几种系统和设备功能故障的所有主要方式;在安全的观点,环境和站的运行情况下评估故障的后果及其影响;确定维护站的可靠性所需的维护活动(预防性,预测性和故障查找);在寻求增加其可靠性的安装项目中寻找改进的机会;确定执行操作程序以及维护或修改现有程序的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号