首页> 外文会议>Boundaries of Rock Mechanics: Recent Advances and Challenges for the 21st Century >Dynamic testing study of the precast assembled electrical manhole
【24h】

Dynamic testing study of the precast assembled electrical manhole

机译:预制装配式电气沙井的动态测试研究

获取原文
获取原文并翻译 | 示例

摘要

Compared with the traditional manhole cast in site, the precast assembled electrical manhole can be constructed much faster, and has better integrity, better aseismic and waterproof ability, etc. In this article, we designed and carried out a dynamic test for the electrical manhole. In this test, automotive dynamic loads were imposed directly on the concrete road surface, and the load-bearing and deformation outcomes were analyzed. The data obtained from the test are also compared with those in the specifications. The test includes installing instruments, carrying out the testing steps, analyzing the outcomes, and so forth. We obtained valuable conclusions, which can serve as reference and guidance for practice in civil engineering.
机译:与传统的现浇人孔相比,预制组装的人孔的建造速度更快,并且具有更好的整体性,抗震和防水性能等。在本文中,我们对人孔进行了设计和动态测试。在该测试中,将汽车动态载荷直接施加在混凝土路面上,并对载荷和变形结果进行了分析。从测试中获得的数据也将与规范中的数据进行比较。该测试包括安装仪器,执行测试步骤,分析结果等。我们获得了有价值的结论,可以作为土木工程实践的参考和指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号