BOTANIE LAKE DAM REHABILITATION Burnaby, British Columbia

机译:BOTANIE湖大坝修复不列颠哥伦比亚本那比

获取原文
获取原文并翻译 | 示例

摘要

This paper presents final design information for the Botanie Lake Dam Rehabilitation and outlines the procedures and process used to complete final design and construction of the rehabilitation works. The work was carried out consistent with CDA Guidelines relative to the Hazard Rating of the Structure. Information is provided on hydrology, dam fill reconstruction, construction of new low level outlet works and a new gabion lined spillway structure. The gabion spillway is believed to be the first of its type constructed in B.C. and was adopted because of paucity of local economic riprap materials and remoteness of the site. First Nation historic sites were discovered in the reconstruction area at the commencement of construction which contributed to delays in the project due to the need for archaeological investigations and studies. However, the work was completed on time and within budget.
机译:本文介绍了Botanie湖大坝修复的最终设计信息,并概述了用于完成修复工程的最终设计和施工的程序和过程。这项工作是按照CDA指南中有关结构危险等级的规定进行的。提供了有关水文,大坝填充重建,新的低水位出口工程的建设以及新的石笼围衬溢洪道结构的信息。石笼网溢洪道被认为是不列颠哥伦比亚省建造的第一条此类溢洪道。之所以采用该版本,是因为缺乏当地的经济翻录材料和该站点的偏僻。在施工开始时,在重建区发现了原住民的历史遗迹,由于需要进行考古调查和研究,导致该项目的延误。但是,这项工作是在预算范围内按时完成的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号