首页> 外文会议>Collaborative management of integrated watersheds >A CONCEPTUAL COST ESTIMATION MODEL FOR HYDROELECTRIC POWER PLANT PROJECTS
【24h】

A CONCEPTUAL COST ESTIMATION MODEL FOR HYDROELECTRIC POWER PLANT PROJECTS

机译:水力发电项目的成本概算模型

获取原文
获取原文并翻译 | 示例

摘要

Due to high number of design parameters and complexity of construction, hydroelectric power plant project costs are affected by many parameters. In this paper, 54 feasibility reports of hydroelectric power plant (HEPP) projects are analyzed. A database is constructed that has the project costs, design parameters and project features. The data set is analyzed by using multiple regression analysis. A cost estimation model is developed to estimate the hydroelectric power plant project cost. This model informs investors about the conceptual cost of the HEPP projects without detailed investigations at the early stages of project.
机译:由于大量的设计参数和施工的复杂性,水力发电站项目的成本受到许多参数的影响。本文分析了54个水电厂项目的可行性报告。构建具有项目成本,设计参数和项目特征的数据库。通过使用多元回归分析来分析数据集。建立了成本估算模型来估算水力发电站项目的成本。该模型可在不对项目早期进行详细调查的情况下,向投资者告知HEPP项目的概念成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号