HOW TO SUCCESSFULLY NAVIGATE THROUGH THE ENVIRONMENTAL MAZE OF PERMITTING AND MITIGATION: THE SAN PABLO DAM SEISMIC UPGRADES PROJECT

机译:如何通过许可和缓解的环境迷宫进行导航:圣帕布洛坝坝地震升级项目

获取原文
获取原文并翻译 | 示例

摘要

Navigating the environmental maze of permitting and mitigation for a major construction project can be daunting. The East Bay Municipal Utility District (EBMUD) recently embarked on a major project to seismically upgrade San Pablo Dam. During environmental review of the project, it became apparent that construction activities would impact jurisdictional wetlands and special status species habitat in the vicinity of San Pablo Dam. Consequently, permitting and mitigation for these impacts were required by both State and Federal regulatory agencies. Due to the sensitive environmental setting and in order to avoid project delays, strategies to keep the permitting effort on schedule included engaging regulatory agency staff on a number of different levels, maintaining communication throughout the entire process, and preparing project support documentation. EBMUD worked cooperatively with the United States (U.S.) Army Corps of Engineers, U.S. Fish and Wildlife Service, California Regional Water Quality Control Board, and California Division of Fish and Game to determine environmental concerns and gain buy-in on the construction project. EBMUD and its consultants made a conscious and consistent effort to respond to agency comments and concerns. As requested by agency staff, EBMUD prepared impact maps, mitigation plans, wetland delineations, financial assurances, draft opinions, and project descriptions as supportive material. By implementing the above strategies, EBMUD secured permits on time and costs related to construction delays were avoided, thus allowing EBMUD to emerge from the regulatory maze with a minimum of twists and turns.
机译:在大型建设项目的许可和缓解环境迷宫中行进可能令人生畏。东湾市政公用事业区(EBMUD)最近着手一项重大工程,以地震方式升级圣巴勃罗大坝。在项目的环境审查期间,很明显,建筑活动将影响圣帕勃罗大坝附近的管辖湿地和特殊地位物种的栖息地。因此,州和联邦监管机构都需要允许和减轻这些影响。由于敏感的环境设置以及为避免项目延误,为了使许可工作如期进行,策略包括在多个不同级别上与监管机构人员进行接触,在整个过程中保持沟通并准备项目支持文档。 EBMUD与美国(美国)陆军工程兵团,美国鱼类和野生动物管理局,加利福尼亚州区域水质控制委员会以及加利福尼亚州鱼类和猎物司合作,以确定对环境的关注并获得建设项目的支持。 EBMUD及其顾问做出了有意识的,一贯的努力来回应机构的评论和关注。根据机构工作人员的要求,EBMUD准备了影响图,缓解计划,湿地轮廓,财务保证,意见草案和项目描述,作为辅助材料。通过实施上述策略,避免了EBMUD准时获得安全许可,并避免了与施工延误有关的成本,从而使EBMUD能够以最少的曲折从监管迷宫出现。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号