首页> 外文会议>Computers in Railways X: Computer System Design and Operation in the Railway and other Transit Systems; WIT Transactions on Built Environment; vol.88 >Modelling and simulation of the traffic management in a migration phase: example of 'Ligne 1' of the Parisian subway
【24h】

Modelling and simulation of the traffic management in a migration phase: example of 'Ligne 1' of the Parisian subway

机译:在迁移阶段进行交通管理的建模和仿真:巴黎地铁“ Ligne 1”示例

获取原文
获取原文并翻译 | 示例

摘要

This paper gives a closer look to the subject of the conversion of a conventional metro line into a fully automated operation without interrupting or disturbing the service. In the introduction, we present the Line 1 Automation project as one of the principal aspects of Paris metro's network modernization plan announced by the Regie Autonome des Transports Parisiens (RATP). Next we give an overview of the present line 1 and illustrate the decision key elements for choosing it as a target of a fully automatic operation. The following section describes the development of the line 1 model and shows the results made so far. Finally, we expose the conclusions of the present work and the outlooks of the line 1 automation project.
机译:本文仔细研究了将传统地铁线路转换为全自动运营而不会中断或干扰服务的主题。在引言中,我们介绍1号线自动化项目,这是巴黎地铁运输协会(RATP)宣布的巴黎地铁网络现代化计划的主要方面之一。接下来,我们对当前的第1行进行概述,并说明将其选择为全自动操作目标的决策关键要素。下一节描述1号线模型的开发并显示到目前为止的结果。最后,我们展示了当前工作的结论以及1号线自动化项目的前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号