首页> 外文会议>Conference on Connections Between Steel and Concrete Vol.2 Sep 10-12, 2001 Stuttgart, Germany >ANCHORAGE OF THE STEEL ELEMENTS TO THE CONCRETE PIERS AT THE SPECIFIC PIPE BRIDGES OVER A DANUBE-BAY IN BUDAPEST
【24h】

ANCHORAGE OF THE STEEL ELEMENTS TO THE CONCRETE PIERS AT THE SPECIFIC PIPE BRIDGES OVER A DANUBE-BAY IN BUDAPEST

机译:在布达佩斯的DANUBE-BAY特定管桥上,将钢元素锚固到混凝土墩上

获取原文
获取原文并翻译 | 示例

摘要

The paper presents the details of anchoring the structural steel elements to the high volume reinforced concrete piers at two specific civil engineering structures recently have been built in Budapest, Hungary. Besides satisfying the load bearing requirements, the aspects of the special building technology and the demand for geometrical regulation of the structures during the construction had to be also taken into account at the design stage of the connections. To satisfy the latter two aspects creating special joins allowing free axial movement and rotation of the steel elements during the execution was necessary. The whole structures are also outlined shortly in relation to the local behaviour of the anchorages.
机译:本文介绍了在匈牙利布达佩斯最近建造的两个特定的土木工程结构上,将钢结构构件锚固到大体积钢筋混凝土墩上的细节。除了满足承重要求外,在连接的设计阶段还必须考虑特殊建筑技术的各个方面以及对结构在结构上进行几何调节的要求。为了满足后两个方面的要求,创建特殊的连接是必要的,以便在执行过程中允许钢构件的自由轴向移动和旋转。还简要概述了与锚地的局部行为有关的整个结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号