LIGO construction has been completed. The three interferometers at the two LIGO observatory sites (Livingston, Louisiana and Hanford, Washington) have been operated successfully as power-recycled Michelson interferometers with Fabry-Perot arm cavities. Commissioning of the interferometers has progressed to operating them simultaneously in this final optical configuration. The initial coincidence operation between the observatory sites has provided a full test of the detector hardware and software subsystems, and full operation of the data acquisition and data analysis systems. The LIGO Laboratory and the LIGO Scientific Collaboration are working together to exploit the early series of interleaved engineering and science runs to commission the detector and data systems, to provide a detailed characterization of the detector and to produce the first scientific results from LIGO. The operation of LIGO is also coordinated with operation of the GEO 600 detector and the ALLEGRO resonant mass detector. The status of this early operation and data study will be presented.
机译:LIGO建设已完成。两个LIGO天文台(路易斯安那州利文斯顿和华盛顿州汉福德)的三个干涉仪已成功用作带有Fabry-Perot臂腔的功率回收迈克尔逊干涉仪。干涉仪的调试已经进展到可以在此最终光学配置中同时操作它们。天文台站点之间的初始重合操作已提供了对探测器硬件和软件子系统的全面测试,以及数据采集和数据分析系统的全面运行。 LIGO实验室和LIGO科学合作组织正在共同努力,利用早期的交错工程和科学运行系列来调试检测器和数据系统,提供检测器的详细特性并从LIGO获得第一批科学成果。 LIGO的操作还与GEO 600检测器和ALLEGRO共振质量检测器的操作相协调。将介绍此早期操作和数据研究的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号