In the German Prototype Spent Fuel Reprocessing Plant Karlsruhe (WAK Fig. 1), reprocessing of nuclear spent fuel was stopped in late 1990 in accordance with the principal political decision to abolish reprocessing on an industrial scale in Germany. Since 1991 the WAK has been under decommissioning. The final decommissioning task is the "green meadow" (stage 3).rnThe decommissioning and dismantling of the WAK will be achieved in six steps taking into account, that some processing and liquid waste storage equipment can be dismantled before and the rest only after the High Active Liquid Waste Concentrate (60m3 HAWC with an activity of 7,7 x E 17 Bq) has been vitrified.rnThe main process equipment and the major utilities of the reprocessing building are already completely dismantled. Today, fine decontamination activities are taking place, to perform the release measurement of the entire building by 2017.rnAfter 8 years of construction and commissioning of the Vitrification Plant Karlsruhe, the VEK started with hot operation Sept. 2009. In March 2010, 45 m3 of 60 m3 high active liquid waste, were vitrified. 80 canisters out of 130 canisters planned with 400 kg waste glass each, were produced. The end of the vitrification of 60 m3 HAWC is expected mid of 2010.rnFive Medium Active Waste (MAW) tanks and four High Active Waste Concentrate (HAWC) tanks have to be dismantled during or after finishing of the HAWC vitrification.rnWith respect to the radiation level (up to - 500 Sv/h) and the overall remaining activity (2,5 x El5 Bq), the tanks (mass in total 90 Mg) have to be dismantled remotely by using a commercially available remotely controlled, hydraulically powered dredger of the 8 Mg class, equipped with state of the art electrical power manipulators in combination with electrical master slave manipulators with force feedback. The heavily shielded concrete cells, housing the MAW and HAWC tanks, are not equipped with suitable access for the demolition equipment, radiation and contamination controlled material transfer, as well as man access. For that purpose, it was necessary to erect an auxiliary building (HWL-Annex South Fig. 2). The HWL-Annex South including its operational facilities - double lid ports, shielding locks, cranes, remote control room, CCTV-Systems and the remote demolition equipment - were commissioned January 2010. Since March, 2010 the remote dismantling of the five MAW tanks is on the way. Two small tanks are already dismantled. The end of remote dismantling of the MAW tanks is expected end of 2010.
机译:在德国原型乏燃料后处理厂卡尔斯鲁厄(WAK图1)中,根据废除德国工业规模后处理的主要政治决定,1990年底停止了核废燃料的后处理。自1991年以来,WAK一直处于退役状态。最终的退役任务是“绿色草地”(第3阶段)。考虑到WAK的退役和拆除工作将分六个步骤进行,其中一些处理和废液存储设备可以在拆除之前进行拆除,而其余的则只能在拆除之后进行。高活性废液(60m3 HAWC,活度为7.7 x E 17 Bq)已玻璃化。rn后处理大楼的主要工艺设备和主要设施已经完全拆除。今天,正在进行精细的去污活动,以在2017年之前对整个建筑物进行释放测量。rn经过8年的玻璃化工厂Karlsruhe的建造和调试,VEK于2009年9月开始热运行。2010年3月,45 m3将60立方米的高活性废液玻璃化。在计划分别装放400公斤废玻璃的130个罐中,生产了80个罐。 60立方米HAWC的玻璃化预计在2010年中期结束。rn在HAWC玻璃化完成期间或之后,必须拆除五个中等活性废物(MAW)储罐和四个高活性废物浓缩物(HAWC)储罐。辐射水平(最高-500 Sv / h)和总剩余活性(2.5 x El5 Bq),必须使用市售的遥控液压挖泥船进行远程拆卸(总质量为90 Mg) 8 Mg级,配备了最先进的电力机械手以及带有力反馈功能的电气主从机械手。装有MAW和HAWC储罐的高防护混凝土池未配备合适的通道来拆卸设备,控制辐射和污染物的转移以及人员通道。为此,有必要建立一个辅助建筑(HWL-Annex South,图2)。 HWL-Annex South包括其操作设施-双盖端口,屏蔽锁,起重机,遥控室,CCTV系统和远程拆卸设备-已于2010年1月投入使用。自2010年3月以来,已对5个MAW坦克进行了远程拆除在途中。两个小坦克已经被拆除。 MAW坦克的远程拆卸预计在2010年底结束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号