FROM CONCEPT TO REALITY 'IN-SITU DECOMMISSIONING' OF THE P AND R REACTORS AT THE SAVANNAH RIVER SITE (SRS)

机译:从概念到现实,Savannah河流域(SRS)的P和R反应器进行“原位退役”

获取原文
获取原文并翻译 | 示例

摘要

SRS recently completed an approximate three year effort to decommission two SRS reactors: P-Reactor (Building 105-P) and R-Reactor (Building 105-R). Completed in December 2011, the concurrent decommissionings marked the completion of two relatively complex and difficult facility disposition projects at the SRS. Buildings 105-P and 105-R began operating as production reactors in the early 1950s with the mission of producing weapons material (e.g., tritium and plutonium-239). The "P" Reactor was shutdown in 1991, while the "R" Reactor was shutdown in 1964. In the intervening period between shutdown and deactivation & decommissioning (D&D), Buildings 105-P and 105-R saw limited use (e.g., storage of excess heavy water and depleted uranium oxide).
机译:SRS最近完成了大约三年的工作,以使两个SRS反应堆退役:P反应器(105-P建筑物)和R反应器(105-R建筑物)。同时进行的退役于2011年12月完成,标志着SRS的两个相对复杂且困难的设施处置项目已经完成。 105-P和105-R号建筑物在1950年代初开始作为生产反应堆运行,其任务是生产武器材料(例如tri和239 p)。 “ P”型反应堆于1991年关闭,而“ R”型反应堆于1964年关闭。在停机,停用和退役(D&D)期间,建筑物105-P和105-R的使用受到限制(例如,存储过量的重水和贫化的氧化铀)。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号