首页> 外文会议>Decommissioning, decontamination and reutilization topical meeting 2012 >INSTALLATION OF A SINGLE-FAILURE-PROOF CRANE AT THE SAVANNAH RIVER SITE TO SUPPORT FACILITY DEACTIVATION
【24h】

INSTALLATION OF A SINGLE-FAILURE-PROOF CRANE AT THE SAVANNAH RIVER SITE TO SUPPORT FACILITY DEACTIVATION

机译:在萨凡纳河河岸安装单个防故障起重机以支持设施停用

获取原文
获取原文并翻译 | 示例

摘要

A single-failure-proof overhead gantry crane was installed in the L-Area Spent Fuel Storage Facility (LSPSF) at the Savannah River Site (SRS), a Department of Energy (DOE) facility. This crane was designed, constructed and installed to meet the requirements of NUREG-0554 [1]. The mission of the LSPFS is to receive shipping casks containing spent nuclear fuel (SNF) from research reactors from both US and foreign sources, remove the SNF from the casks and store it underwater in a basin. At the initiation of the crane project, the facility had been scheduled to begin the deactivation and decommissioning process in 2019. To support this objective, the SNF was to be removed from the facility and shipped to another facility at SRS for processing. In view of this anticipated increase in SNF handling, a project to replace or upgrade the facility's 1950s era 85-ton capacity overhead gantry crane was initiated.
机译:能源部(DOE)设施萨凡纳河工地(SRS)的L区乏燃料存储设施(LSPSF)中安装了可防止单故障的高架龙门起重机。该起重机的设计,制造和安装均符合NUREG-0554 [1]的要求。 LSPFS的任务是从美国和国外来源的研究堆中接收装有乏核燃料(SNF)的运输桶,从桶中取出SNF,并将其存储在水下的盆地中。在起重机项目启动时,该工厂计划于2019年开始停用和退役。为了实现这一目标,SNF将从工厂中移出并运送到SRS的另一家工厂进行处理。鉴于SNF处理的这种预期增长,已启动了一个项目,以替换或升级该设施的1950年代时代的85吨能力的桥式龙门起重机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号