【24h】

Geotechnical requirements for tailings dams in Western Australia

机译:西澳大利亚尾矿坝的岩土工程要求

获取原文
获取原文并翻译 | 示例

摘要

Due mainly to the increased community concerns on the potential safety and environmental hazards associated with mine tailings, the tailings management practices in Western Australia (WA) were reviewed in 1989. The review identified significant deficiencies in tailings management and the need for improvements. In response to the findings of the review the regulatory approach to the tailings management in WA has been changed during the 1990s. The changes included formulation of two sets of guidelines and introduction of tenement conditions specific to tailings management. The objectives of the guidelines are to encourage a well-engineered uniform approach to tailings management based on the application of geotechnical engineering. The guidelines have been readily accepted by the mining industry and the consultants engaged in tailings management. Since the introduction of the guidelines there have been significant improvements in tailings management in WA.
机译:主要原因是,社区日益关注与矿山尾矿有关的潜在安全和环境危害,因此于1989年对西澳大利亚州(WA)的尾矿管理做法进行了审查。该审查发现了尾矿管理方面的重大缺陷和需要改进的地方。根据审查的结果,在1990年代,西澳大利亚州尾矿管理的管理方法发生了变化。这些变化包括制定了两套准则,并引入了针对尾矿管理的矿权条件。该准则的目的是鼓励基于岩土工程的应用,对尾矿管理采用精心设计的统一方法。该准则已为采矿业和从事尾矿管理的顾问所接受。自从引入指南以来,西澳州的尾矿管理有了显着改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号