Large wind integration challenges and solutions for operations and system reliability

机译:大型风电集成挑战以及运营和系统可靠性的解决方案

获取原文
获取原文并翻译 | 示例

摘要

Bonneville Power Administration is experiencing an unprecedented growth of wind generation resources in its Balancing Authority Area. In order to accommodate the amount of wind that is planned, BPA has had to create new processes in order to limit the amount of balancing resources being used due to the variation of wind. The calculation of the balancing resource requirements and the resulting short-term solutions will be discussed, and then the presentation will evolve to the solutions that are being worked on in BPA and across the industry, including multiple national labs, to mitigate the effects of variable generation on an interconnection.
机译:邦纳维尔电力管理局(Bonneville Power Administration)的平衡管理局(Balancing Authority)地区正经历着前所未有的风力发电资源增长。为了适应计划的风量,BPA必须创建新的流程,以限制由于风的变化而使用的平衡资源的数量。将讨论平衡资源需求的计算以及由此产生的短期解决方案,然后,演讲将演变为BPA和整个行业(包括多个国家实验室)正在研究的解决方案,以减轻变量的影响互连上的发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号