The Three Gorges Project (TGP) is the largest project in China which is being under construction today. The permanent shiplock is located in left bank of the dam, and there ex st rock slopes with the maximum height more than 170 m which will be formed completely by rock cut in Tan Z ling mountain in left bank. There are more than 300 rock blocks appeared in the vertical wall of the rock slopes du ing the Shiplock Excavation. The TGP has a layout with an underground power house in capacity of 4,200 MW, which is located in the right bank of the dam, and it will be lately under construction after the completion of dam construction. With usage of block theory, this paper presents the stability analysis of rock blocks in the permanent shiplock and the underground powerhouse, and some improvements of Block Theory for its engineering applications have been studied.
机译:三峡项目(TGP)是目前正在建设中的中国最大的项目。永久性船闸位于水坝左岸,其中最大高度超过170 m的岩质斜坡将完全由左岸谭子岭山上的岩石切割形成。船闸发掘期间,在岩石斜坡的垂直壁上出现了300多个岩石块。三峡工程的布局为地下电站,容量为4,200兆瓦,位于大坝的右岸,大坝建设完成后将在近期建设中。利用块理论,对永久性船闸和地下厂房岩体的稳定性进行了分析,并对块理论在工程上的应用进行了一些改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号