【24h】

An experience on planning large pumping systems in a critical situation

机译:在紧急情况下计划大型抽水系统的经验

获取原文
获取原文并翻译 | 示例

摘要

This paper treats a very fundamental pump planning of a suit of huge raw water pumps, which includes the determination of the owner of the pumps, their positioning and the method of suction in some characteristic way, to lead trie condition to be the most favorable for Tokyo Waterworks, assuring the free hand on their operation to the latter. The pumps receive river water from the hand of Japan Water Resources Development Public Corporation, and transmit it as raw water to two purification plants, Asaka (new) and Higashi-Murayama (existing), while are playing important role to connect two river systems and flexible accommodation of water within the network for the city of Tokyo. As whole Plant at Asaka is the biggest one in Tokyo, the pumps and their appurtenances are of record gigantic scales on sophisticated technology at the time of 1950-60's, some of their aspects are also introduced as possible.
机译:本文讨论了一套大型原水泵的非常基本的泵计划,其中包括确定泵的拥有者,确定泵的位置以及采用某些特殊方式进行抽吸的方法,以使条件最适合东京水务确保向后者放手。这些泵从日本水资源开发公共公司手中获得河水,并将其作为原水传输到朝霞(新)和东村山(现有)两个净化厂,同时在连接两个河流系统和污水处理方面发挥着重要作用。在东京市内的网络中灵活地容纳水。由于Asaka的整个工厂是东京最大的工厂,因此泵及其配件在1950至60年代具有先进技术的创纪录规模,因此也尽可能介绍了它们的某些方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号