The innovation of construction in the III-stage of RCC cofferdam of the Three Gorges Project

机译:三峡工程碾压混凝土围堰三期工程建设创新

获取原文
获取原文并翻译 | 示例

摘要

The III-stage RCC cofferdam of the Three Gorges Project is the largest RCC cofferdam in the world. There are many innovations on technique and management of construction during the construction by China Gezhouba water & power (group) co. Ltd. For example, in technique, application of the tower belt machine boldly for placing RCC; newly developed continuous alternate rising cantilever steel formwork for the need of continuous rising in high intensity; new facility and washing equipment for tipper transportation; application of the crystal waterproof material with cement base at the upstream side; in construction management, the research of computer emulation research of construction have been prepared to guide the decision. The whole cofferdam has been completed ahead of 60 days. There are sever world records have been set on the RCC darn. It's been proved by coring that the RCC placed is continuous, intact, well-distributed texture, well-cemented. All construction innovations on the III-stage RCC cofferdam of the Three Gorges Project shall be set forth in the paper.
机译:三峡工程的三期RCC围堰是世界上最大的RCC围堰。中国葛洲坝水电(集团)总公司在施工过程中对施工技术和管理进行了许多创新。例如,在技术上,大胆应用塔带机来放置碾压混凝土;新开发的连续交替上升悬臂钢模板,需要高强度连续上升;自卸车的新设施和清洗设备;将晶体防水材料在上游侧涂水泥基;在建筑管理中,已经准备了建筑计算机仿真研究的研究来指导决策。整个围堰已经提前60天完成。 RCC织构已设置了数个世界纪录。取芯已证明,放置的RCC是连续的,完整的,分布均匀的水泥。三峡工程三期碾压混凝土围堰的所有建设创新都将在本文中提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号