首页> 外文会议>GeoShanghai International Conference; 20060606-08; Shanghai(CN) >Geotechnical Investigation of Landfill Rautenweg in Vienna
【24h】

Geotechnical Investigation of Landfill Rautenweg in Vienna

机译:维也纳Rautenweg垃圾填埋场的岩土工程勘察

获取原文
获取原文并翻译 | 示例

摘要

The paper presents the geotechnical investigation, instrumentation and analysis of some geotechnical problems of a landfill. The stability of the cascade embankments for slope stabilization is studied by the slice method and by the finite element method. The results of the geotechnical instrumentation are briefly discussed. The landfill settlement is investigated by finite element method. The numerical calculations are compared with the results of the geotechnical instrumentation.
机译:本文介绍了垃圾填埋场的岩土工程调查,仪器仪表和一些岩土工程问题的分析。用切片法和有限元法研究了级联路堤的稳定性。简要讨论了岩土仪器的结果。填埋场沉降采用有限元方法进行研究。将数值计算与岩土仪器的结果进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号