首页> 外文会议>Healthy water environmental of buildings >Experiment Study on Drainage Capacity of Self-circulation and Double Stack System by Using Instantaneous Flow
【24h】

Experiment Study on Drainage Capacity of Self-circulation and Double Stack System by Using Instantaneous Flow

机译:瞬时流量自循环双栈系统排水能力试验研究

获取原文
获取原文并翻译 | 示例

摘要

This experiment used instantaneous flow generator drain away water on 34-layer tower.Investigate the different drainage pressure in each stack drainage system, explore the relationship between the pressure and flow rate, and confirm the corresponding drainage capacity.Analyze from multiple perspectives to provide reference for engineering application.The results show that: the drainage capacity (when the arranging diameter of the vent is the same) is main and secondary loop vent stack system > self-circulating loop vent stack system > self-circulating specific vent stack system, and DN110mm × DN110mm >DN125mm × DN110mm in each system; And the drainage capacity of the three drainage systems is significantly less than the maximum design fiow capacity value of building water supply and drainage design specifications (GB50015-2009).
机译:本实验采用瞬时流量发生器将34层塔上的水排尽,研究每个烟囱排水系统中不同的排水压力,探讨压力与流量之间的关系,并确定相应的排水能力,从多角度进行分析以提供参考结果表明:排水能力(当排风口的布置直径相同时)是主,副环排烟囱系统>自循环环排烟囱系统>自循环特定排烟囱系统,以及每个系统中DN110mm×DN110mm> DN125mm×DN110mm;三个排水系统的排水能力明显小于建筑给排水设计规范(GB50015-2009)的最大设计流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号