首页> 外文会议>Innovate integrate amp; invigorate >A Second Application of the CEaVa Method
【24h】

A Second Application of the CEaVa Method

机译:CEaVa方法的第二次应用

获取原文
获取原文并翻译 | 示例

摘要

In the complex world of developing requirements and eliciting user needs, engineers build billions of dollars of products that are wrong on delivery, because they solved the wrong problem. The problem statement does change, because the environment (i.e., schedule, technology, people, or politics) changes. The Continuous Early Validation (CEaVa) refinement method will stabilize the problem statement (i.e., critical requirements or KPPs), which will enhance the probability of building the right product. We will highlight the second application on a billion dollar Army Information Technology system case study that utilized the CEaVa method.
机译:在不断发展的需求和引起用户需求的复杂世界中,工程师制造了数十亿美元的交付时错误的产品,因为他们解决了错误的问题。问题陈述的确发生了变化,因为环境(即进度,技术,人员或政治)发生了变化。连续早期验证(CEaVa)细化方法将稳定问题陈述(即关键要求或KPP),这将增加制造正确产品的可能性。我们将重点介绍利用CEaVa方法的价值10亿美元的陆军信息技术系统案例研究中的第二个应用程序。

著录项

  • 来源
  • 会议地点 Melbourne(AU)
  • 作者

    Bob Larsen; rnDennis Buede;

  • 作者单位

    LTC, US Army 9320 Winbourne Rd Burke, Va 22015 Phone: (703) 425-0044 EMAIL: larsenva@erols.com;

    rnGeorge Mason University Dept of Systems Engineering and Operations Research Fairfax, Va. 22030 Phone: (703) 993-1727 Fax: (703) 993-1706 EMAIL: dbuede@gmu.edu;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 系统工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号