首页> 外文会议>Innovative infrastructures - toward human urbanism : Report >Roof over PGE Arena in Gdansk. Review of structure and monitoring system
【24h】

Roof over PGE Arena in Gdansk. Review of structure and monitoring system

机译:在格但斯克PGE竞技场的屋顶。审查结构和监测系统

获取原文
获取原文并翻译 | 示例

摘要

This paper presents general structural assumptions of the steel construction designed for a newrnfootball stadium to be built for UEFA Championship 2012 in the city of Gdańsk. The superstructurernis founded directly on the modified abutment. The facade and the roof are collected from 82 steelrngirders made of tube profiles. The girders are braced by circular beams and X tension rods. All thisrncreates a quasi – dome covered by polycarbonate cladding. During the fabrication and erectionrnseveral problem occurred. Major difficulties and repairing procedures are presented here.
机译:本文介绍了为即将在格但斯克市举办的2012年UEFA锦标赛建造的纽恩橄榄球体育场设计的钢结构的一般结构假设。上部结构直接建立在改性基台上。立面和屋顶是从82个由钢管型材制成的钢管中收集的。大梁由圆梁和X拉杆支撑。所有这些都形成了一个由聚碳酸酯覆层覆盖的准圆顶。在制造和安装过程中发生了几个问题。这里介绍主要的困难和维修程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号