首页> 外文会议>Innovative infrastructures - toward human urbanism : Report >Construction Supervion and Control of Double-Walled Steel Cofferdam for Xin Zao Extra-large Pearl River Bridge
【24h】

Construction Supervion and Control of Double-Walled Steel Cofferdam for Xin Zao Extra-large Pearl River Bridge

机译:新枣特大珠江大桥双壁钢围堰施工监理

获取原文
获取原文并翻译 | 示例

摘要

The paper describes in detail the supervisory calculation and site monitoring supervision on therndouble-walled steel cofferdams which were built for main piers of the Xin Zao extra-large PearlrnBridge in nearby Guangzhou City, and briefly introduces the researches on during study and gathersrnexperience on actual tests of load, material, press, displacement of the steel cofferdam.
机译:本文详细介绍了广州附近新枣特大型珠江大桥主墩建造的双壁钢围堰的监控计算和现场监测监控,并简要介绍了研究过程中的研究情况,并收集了实际试验的经验。的载荷,材料,压力,钢围堰的位移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号