首页> 外文会议>International Conference on Nuclear Engineering: Abstracts >GTM (GUANGDONG TEN-YEAR MODIFICATIONS):THE CHINESE EXPERIENCE IN PLANT SAFETY ALIGNMENT
【24h】

GTM (GUANGDONG TEN-YEAR MODIFICATIONS):THE CHINESE EXPERIENCE IN PLANT SAFETY ALIGNMENT

机译:GTM(广东省十年修正案):中国人在植物安全管理方面的经验

获取原文

摘要

The present article introduces therecent experience by Framatome-ANP ofdeveloping a large scale engineering projectin China. The so-called GTM project dealswith the studies and the site implementation ofa dozen of major design improvements at theGuangdong Nuclear Power Station on DayaBay site, stemming from the Periodic SafetyReassessment (PSR) carried-out by theUtility.This article focuses on the benefits of sharingwith the Chinese utility the long experience ofthe study of the modification batches 'lot93'and 'VD2' implemented on the French CPY900 Mwe series units and on the confidencegained throughout years of continuous sino-frenchtechnical cooperation that wasestablished by the plant owner in Framatome-ANP'scapabilities to carry-out the successfuldevelopment of the project. IndeedFramatome-ANP involved its Chinesepartners Beijing Institute of NuclearEngineering, China Nuclear Industry 23 rdCompany and Shenzhen Nuclear EngineeringCompany to localize design and erectionactivities. The successful achievement of theGTM studies proved the maturity of theChinese engineering competencies to set-upa sustainable industrial scheme devoted tothe further development of nuclearengineering services in China.
机译:本文介绍Framatome-ANP在中国开展大型工程项目的最新经验。所谓的GTM项目是根据公用事业公司进行的定期安全性重新评估(PSR),对大亚湾站点广东核电站进行的十几项重大设计改进的研究和站点实施。本文着重讨论与之共享的好处。中国公用事业公司对法国CPY900 Mwe系列机组实施的改装批号'lot93'和'VD2'的长期研究经验以及工厂所有者在Framatome-ANP建立的多年中欧技术合作中获得的信心所积累的长期经验'有能力进行项目的成功开发。确实,Framatome-ANP的合作伙伴包括北京核工程学院,中国核工业第二十三公司和深圳核工程公司,以本地化设计和安装活动。 GTM研究的成功完成证明了中国工程技术能力的成熟,以建立致力于中国核工程服务进一步发展的可持续工业计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号