Control of Longitudinal Movement of Long Span Cable Stayed Bridge

机译:大跨度斜拉桥纵向运动控制

获取原文
获取原文并翻译 | 示例

摘要

Control of longitudinal movement of suspended deck is a critical issue of the design of long span cable stayed bridge. Longitudinal movement and sectional forces of tower at the base of cable stayed bridge with main span of 1,000m are calculated to demonstrate how this issue is critical. Possible measures to control the longitudinal movement are briefly introduced and how they work to restrain the longitudinal movement hence optimize the sectional force of tower at the base of the same cable stayed bridge is calculated. Finally, favorable measures to control the longitudinal movement of suspended deck of the long span cable stayed bridge is proposed.
机译:悬吊甲板纵向运动的控制是大跨度斜拉桥设计的关键问题。计算了主跨为1000m的斜拉桥塔基的纵向移动和截面力,以证明该问题的严重性。简要介绍了控制纵向运动的可能措施,并介绍了如何抑制纵向运动,从而优化了同一斜拉桥基座塔架的截面力。最后,提出了控制大跨度斜拉桥悬索桥纵向运动的有利措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号