【24h】

Digital ATC support for the RAMS standard

机译:支持RAMS标准的数字ATC

获取原文
获取原文并翻译 | 示例

摘要

A RAMS (Reliability, Availability, Maintainability and Safety) document concerned with a brand new digital ATC (Automatic Train Control) system has been developed in proportion to IEC 62278. The ATC system is going to be applied for the most important commuter lines in the Tokyo Metropolitan Area in place of the present analog ATC system. East Japan Railway has taken a leading role in the safety and reliability field from the system development phase. Thorough documentation activities had been kept from the principle examination stage in 1996 prior to the establishment of the IEC standard. The digital ATC realizes shorter train headway, and improves riding comfort. Its train control functions are as follows. (1) An ATC logic controller generates stop point information based on areas such as the position of the preceding train, and transmits it to the following train through the rails as a digital ATC signal. (2) An on-board ATC device monitors the position of the train, retrieves the parabolic train deceleration profiles and applies the brakes if necessary. The design, manufacture, and installation have been underway since 2000, with operation on the Keihin Tohoku Line scheduled to commence in 2003. System requirements were developed further into a set of system fundamentals in such a way that the basic content was already organized in accordance with the RAMS concept and system definition and application conditions stages. In 2003, East Japan Railway and Hitachi began to align the process of achieving safety and reliability of the digital ATC system with IEC 62278. This is possibly the first attempt anywhere to actually adjust such a large scale system as a whole to comply with the RAMS standard. As the result, we confirmed that our conventional development process of safety related railway equipment is one which sufficiently fulfills the RAMS standard.
机译:已根据IEC 62278的要求开发了与全新的数字ATC(自动列车控制)系统有关的RAMS(可靠性,可用性,可维护性和安全性)文档。ATC系统将用于全球最重要的通勤线路。东京都区域代替当前的模拟ATC系统。从系统开发阶段开始,东日本铁路在安全性和可靠性领域就一直处于领导地位。在IEC标准建立之前的1996年,从原则审查阶段起就没有进行任何详尽的文档活动。数字ATC可以缩短列车的行进距离并提高乘坐舒适性。其列车控制功能如下。 (1)ATC逻辑控制器根据诸如前车的位置之类的区域生成停车点信息,并将其作为数字ATC信号通过轨道传输到后车。 (2)车载ATC设备监视列车的位置,检索抛物线形列车的减速曲线,并在必要时施加制动。自2000年开始进行设计,制造和安装,计划于2003年开始在京滨东北线上运行。系统要求已进一步发展为一套系统基本原理,其基本内容已经按照RAMS概念,系统定义和应用条件阶段。 2003年,东日本铁路公司和日立公司开始将实现数字ATC系统的安全性和可靠性的过程与IEC 62278保持一致。这可能是首次尝试在任何地方实际调整这样的大型系统,使其符合RAMS。标准。结果,我们确认我们的安全相关铁路设备的常规开发过程是充分满足RAMS标准的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号