Umicore (formerly Union Miniere) acquired the Bulgarian State Owned copper smelter MDK in September 1997. During this period from 1997 until 2000, Umicore conducted a program to stabilize existing operations and identify investment needs to expand production and meet environmental standards. From mid 2000 through April of 2002 a project was engineered and constructed to increase capacity of the plant from 165,000 to 210,000 tons per year anode copper. The project was also designed to bring the plant into compliance with Bulgarian regulations for SO_2 and particulate emissions. The contracted work consisted of installation of two new concentrate dryers, complete rebuild of the converters and converter gas cleaning, and major improvements to the sulfuric acid plants. This paper will describe the projects leading up to the May 2002 start-up of the expanded plant, the actual start-up and the subsequent performance during the first year of operation.
机译:Umicore(前身为Union Miniere)于1997年9月收购了保加利亚国有的铜冶炼厂MDK。从1997年至2000年,Umicore实施了一项计划,以稳定现有运营并确定扩大生产并达到环境标准的投资需求。从2000年中期到2002年4月,设计并建造了一个项目,以将工厂的阳极铜产能从每年165,000吨增加到210,000吨。该项目还旨在使工厂符合保加利亚关于SO_2和颗粒物排放的法规。承包的工作包括安装两台新的浓缩干燥机,转炉的完全改造和转炉气的清洁以及对硫酸装置的重大改进。本文将描述2002年5月扩建工厂投产之前的项目,实际投产以及运营第一年的后续表现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号