The Strengthening and Refurbishment of Westfield Pill Bridge Pembrokeshire

机译:韦斯特菲尔德丸桥彭布罗克郡的加固和翻新

获取原文
获取原文并翻译 | 示例

摘要

Westfield P,l Bridge was built in 1969 and is a post tensioned seven span continuous bridge with an overall length of approximately 260-m. Parsons Brinckerhoff Ltd was commissioned in 1997 to carry out a Special Inspection of the Post Tensioning System in accordance with UK Highways Agency Standard BA 50/93. As a result of this inspection, and a subsequent load assessment, and due to matters unrelated to the condition of the post tensioning system, the bridge was closed to all traffic because of serious structural inadequacies Following temporary strengthening, the bridge was reopened to limited traffic while permanent strengthening was designed and procured. Innovative Design and Contract Procurement methods have allowed the bridge to be strengthened quickly to allow the bridge to be opened to unrestricted traffic. This paper describes the lifecycle of the project.
机译:Westfield P,l桥建于1969年,是后张拉的七跨连续桥,全长约260米。帕森斯·布林克霍夫有限公司(Parsons Brinckerhoff Ltd)于1997年受委托,根据英国公路局标准BA 50/93对后张紧系统进行特殊检查。经过这次检查和随后的负荷评估,并且由于与事后张紧系统的状况无关的事项,由于严重的结构缺陷,这座桥禁止所有车辆通行。临时加固之后,该桥重新开放给有限的车辆通行同时设计并采购了永久加固。创新的设计和合同采购方法使桥梁得以快速加固,从而可以向不受限制的交通开放。本文介绍了该项目的生命周期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号