首页> 外文会议>International Conference on Dam Engineering; 20041018-20; Nanjing(CN) >Dynamic design for high slope treatment for left bank underground power house intake of Longtan hydroelectric project
【24h】

Dynamic design for high slope treatment for left bank underground power house intake of Longtan hydroelectric project

机译:龙滩水电站左岸地下厂房进水口高边坡处理的动态设计。

获取原文
获取原文并翻译 | 示例

摘要

The high slope treatment for left bank underground powerhouse intake of Longtan hydroelectric project is one of the important technical issues for the project construction. The excavation and strengthening scheme was determined after pre-exploration, lots of scientific experiments and stability study having been carried out. Furthermore, emphasis was placed on strengthening dynamic design and control for the project in the period of the construction. This paper gives a brief introduction for the slope geological conditions, outline of the design general situation, dynamic design concept and procedures and the dynamic design and control for the project in the construction practice.
机译:龙滩水电站左岸地下厂房进水口高边坡治理是工程建设的重要技术问题之一。开挖后确定了开挖和加固方案,进行了大量的科学实验和稳定性研究。此外,重点是在施工期间加强项目的动态设计和控制。本文简要介绍了边坡地质条件,设计概况,动态设计思想和程序,以及在工程实践中项目的动态设计和控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号