首页> 外文会议>International Conference on Dam Safety Management(2008水库大坝安全管理国际研讨会) >Installation and Data Analysis on Safety Monitors Instrument of Yanshan Reservoir Impervious Wall
【24h】

Installation and Data Analysis on Safety Monitors Instrument of Yanshan Reservoir Impervious Wall

机译:燕山水库防渗墙安全监测仪安装与数据分析

获取原文

摘要

For mastering the operation state of the dam foundation cut-off master, the ninety-six strain gauges, no stress gauges, reinforced gauges and soil pressure gauge are buried in six sections during construction period. As using the installing method of steel pop-up agen-cies to ensure the good rate of equipment Installation, various monitoring instrument work normally. Preliminary analysis of the observation data from the monitoring instruments over the past year shows the workability of cut-off is normal recently.
机译:为了掌握大坝基础切断主机的运行状态,在施工期间将96台应变仪,无应力仪,加固仪和土压力仪埋在六个部分中。为保证设备良好的安装率,采用钢弹弹出机构的安装方法,各种监控仪器都可以正常工作。对过去一年中监测仪器的观测数据进行的初步分析表明,截止的可操作性最近是正常的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号