首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Practice and Experiences on Integrated Operation of Qingjiang Cascade Hydropower Stations
【24h】

Practice and Experiences on Integrated Operation of Qingjiang Cascade Hydropower Stations

机译:清江梯级水电站一体化运行的实践与体会。

获取原文
获取原文并翻译 | 示例

摘要

When cascade hydropower stations are operated with the optimal integrated technique, it is useful for rational distribution of water resource, improvement of hydro-power utilization rates, increasing of power enterprises benefit, and according with the general, harmonious, sustainable scientific development concept. With the case studying of Qingjiang cascade hydropower stations, it is indicated that the optimal integrated operation is very useful and can improve the hydropower generation greatly.
机译:当梯级水电站采用最优综合技术运行时,有利于水资源的合理分配,水电利用率的提高,电力企业效益的提高,并符合普遍,和谐,可持续的科学发展观。以清江梯级水电站为例,表明优化综合运行是非常有用的,可以大大提高水力发电量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号