首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Realization of Expansion Modification for Unit 1~3 of Dongfeng Power Plant
【24h】

Realization of Expansion Modification for Unit 1~3 of Dongfeng Power Plant

机译:东风电厂1〜3号机组扩容改造的实现

获取原文
获取原文并翻译 | 示例

摘要

Presented in the text is the expounding and proofing for the expansion modification of unit 1~3 of Dongfeng Power Plant as well as the implementation thereof. The operation and economical efficiency achieved after modification is discussed. This will provide reference and experiences for expansion modification of other power stations.
机译:文中介绍了东风电厂1〜3号机组扩容改造的说明和证明及其实现。讨论了修改后实现的操作和经济效率。这将为其他电站的扩容改造提供参考和经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号